Project
Management in Primavera P6
|

Course Outline
Description:
This course provides hands on Oracle Primavera
training for Oracle's client/server-based solution, leading participants
through the entire project life cycle, from planning to execution. Topics
include adding activities, assigning resources, and creating a baseline.
Participants also will gain a thorough background in the concepts of planning
and scheduling. All workshops and instruction stress the three basic elements
of project management: schedule, resource and costs.
Course
Length: 3 Days
Targeted
Roles: Program managers, project managers,
planners/schedulers.
Prerequisites:
Fundamental project management training,
knowledge of MS Windows.
Course
Contents:
Day One:
Introduction
to Oracle Primavera
- Describe
Oracle Primavera solutions
- Describe P6
The Project
Management Life Cycle
- Review the
relationship between Primavera and the Project Management Life Cycle
- Identify
the five process groups in the Project Management Life Cycle
Data,
Navigating, and Layouts
- Describe
enterprise and project-specific data
- Log in
- Open an
existing project
- Navigate in
the Home window and Activities window
- Open an
existing layout
- Customize a
layout
- Save a
layout
Enterprise
Project Structure
- Describe
the components that comprise the Enterprise Project Structure
- View the
EPS
Creating a
Project
- Create a
project
- Navigate in
the Projects window
- View and
modify information in Project Details
Creating a
Work Breakdown Structure
- Define a
Work Breakdown Structure
- Create
multiple levels of a WBS hierarchy
Adding
Activities
- Describe an
activity and its components
- Describe
activity types
- Add
activities
- Add a
Notebook topic to an activity
- Add steps
to an activity
- Assign
activity codes to activities
Day Two:
Creating
Relationships
- View a
network logic diagram
- Differentiate
between the four relationship types
- Create
relationships in the Activity Network
- Create
relationships in Activity Details
Scheduling
- Perform a
forward and backward pass
- Describe
float and its impact on a schedule
- Identify
loops and open ends
- Calculate a
schedule
- Analyze the
scheduling log report
Assigning
Constraints
- Apply an
overall deadline to a project
- Apply a
constraint to an individual activity
- Add
notebook topics to constrained activities
- Describe
the available constraint types
Maintaining
the Project Documents Library
- Describe
the difference between a work product and a reference document
- Create a
document record
- Link the
document record to a project document or work product
- Assign the
project document to an activity or WBS
Formatting
Schedule Data
- Group
activities according to a specific criteria
- Sort
activities
- Apply a
filter
- Create a
filter
Roles and
Resources
- Describe
roles
- Views the
roles dictionary
- Describe
resources
- Identify
the differences between labor, nonlabor and material resources
- View the
resource dictionary
Assigning
Roles
- Assign
roles to an activity
- Assign
rates on roles
Day Three:
Assigning
Resources and Costs
- Assign
resources by role
- Assign
labor, nonlabor, and material resources to activities
- Adjust
Budgeted Units/Time for a resource
- Assign
expenses to activities
Analyzing
Resources
- Display the
Resource Usage Profile
- Format a
profile
- Format the
timescale
Optimizing the
Project Plan
- Analyze
schedule dates
- Shorten a
project schedule
- Analyze
resource availability
- Remove
resource overallocation
- Analyze
project costs
Baselining the
Project Plan
- Create a
baseline plan
- Display
baseline bars on the Gantt Chart
- Modify the
bars on the Gantt Chart
Project
Execution and Control
- Describe
several methods for updating the project schedule
- Use
Progress Spotlight
- Status
activities
- Reschedule
the project
Reporting
Performance
- Describe
reporting methods
- Run a
schedule report
- Create a
resource report with the Report wizard
- Create a
report using the current layout
Project Web
Site
- Create and
launch a project Web site
- Customize
the appearance of a project Web site
- Publish
activity layouts as HTML pages